Initial GSP 2022 — 8-009 BEAR VALLEY
Base Information
Reginald Lamson (Bear Valley Basin GSA)
PO Box 1929
Big Bear Lake, CA 92315
1-760-559-8172
rlamson@bbldwp.com
PO Box 1929
Big Bear Lake, CA 92315
1-760-559-8172
rlamson@bbldwp.com
Notice Date: 01/05/2022
BVBGSA GSP Stakeholders send letters to adopt GSP.xlsx (23.9kB)
The notice was published in the 1/5/22 and 1/12/22 editions of the Big Bear Grizzly Newspaper.
Public Notice Adoption of GSP.doc (51.5kB)
BVBGSA GSP Stakeholders send letters to adopt GSP.xlsx (23.9kB)
Public Hearing Date: 06/21/2022
The BVBGSA GSP was adopted at the end of the Public Hearing on 6/21/22.
City of Big Bear Lake.pdf (60kB)File Name | GSP Regulation Element(s) | Uploaded Date & Time |
---|---|---|
GSP_BearValleyBasin-Public_Comment.pdf (270.9kB) | §354.10(c) | 01/28/2022 11:04 AM |
Title | Publication Name | Publish Date | Author(s) | File Name or URL |
---|---|---|---|---|
Final 2018 Bulletin 118 Groundwater Basin Boundaries | 2019-02-11 | California Department of Water Resources | ||
Applied Hydeogeology | 3rd Edition, Macmillan College Publishing, New York | 1993-10-22 | Fetter, C.W. | |
Geohydrology of Big Bear Valley, California: Phase 1 - Geology Framewokd, Recharge and Preliminary Assessmet of the Source and Age of Groundwater | USGS Scientific Investigations Report | 2012-01-01 | Flint, L.E. and Martin, P. | |
Geohydrologic Characteristics and Artificial Recharge Potential of the Sand Canyon Area | 1990-12-01 | Geoscience Support Services | ||
Re-Evaluation of Maximum Perennial Yield in the Baldwin Lake Watershed | 1999-07-13 | Geoscience Support Services | ||
Results of Drilling, Construction, Testing and Pump Design for BBCCSD Well No. 3B | 2000-10-23 | Geoscience Support Services | ||
Re-Evaluation of Maximum Perennial Yield – Big Bear Lake Watershed and a Portion of the Baldwin Lake Watershed | 2001-08-24 | Geoscience Support Services | ||
Well 8 (Palomino Site) Results of Drilling, Construction, Testing, and Pump Design | 2003-08-21 | Geoscience Support Services | ||
Well 9 (Greenway Park Site) Results of Drilling, Construction, Testing, and Pump Design | 2003-11-20 | Geoscience Support Services | ||
Well 10 (Booster Station Site) Results of Drilling, Construction, Testing, and Pump Design | 2003-12-09 | Geoscience Support Services | ||
Summary of Drilling and Testing at Four Test Drilling Sites – Big Bear Lake Watershed | 2003-08-08 | Geoscience Support Services | ||
Geohydrologic Evaluation of Artificial Recharge Potential in the Big Bear Valley, California | 2004-10-01 | Geoscience Support Services | ||
Recommended Casing, Screen, and Filter Pack Design – Canvasback Production Well | 2004-07-22 | Geoscience Support Services | ||
Geohydrologic Evaluation of the Maximum Perennial Yield of the Lake Williams Area, Baldwin Lake Watershed | 2004-01-27 | Geoscience Support Services | ||
Results of Drilling and Testing – Big Bear Valley Ground Water Exploration Program - 2004 | 2005-07-08 | Geoscience Support Services | ||
Technical Memorandum – Perennial Yield Update for the City of Big Bear Lake Department of Water and Power Service Area | 2006-02-02 | Geoscience Support Services | ||
Hydrogeologic Evaluation for Wetlands Restoration And Maintenance, Southeast Baldwin Lake, San Bernardino Mountains, California | 1994-04-28 | Johnson, Theodore, Authur | ||
Re-Evaluation of Sustained Ground Water Yields, Big Bear Lake Watershed, San Bernardino County, California | 1987-01-01 | LeRoy Crandall and Associates | ||
Re-evaluation of Sustained Yields, Baldwin Lake Watershed | 1987-01-01 | LeRoy Crandall and Associates | ||
Reverse-Fault System Bounding the North Side of the San Bernardino Mountains, in Recent Reverse Faulting in the Transverse Ranges, California | United States Geological Survey Professional Paper | 1987-01-01 | Miller, F.K. | |
Preliminary Geologic Map of the Big Bear City 7.5’ Quadrangle, San Bernardino County, California | United States Geological Survey Open File Report | 2004-11-01 | Miller, F.K. | |
Ground Water Atlas of the United States, Segment 1 – California and Nevada | USGS Hydrologic Investigations Atlas | 1995-01-01 | Planert, M. and Williams, J.S. | |
Hydrogeological Evaluation of Hamilton Ranch Property, Erwin Lake, California | 1988-10-21 | Ron Barto and Associates | ||
Geology of the San Bernardino Mountains | California Division of Mines and Geology Open File report | 1982-01-01 | Sadler, P.M. | |
Estimating the Transmissivity of a Water-table Aquifer from the Specific Capacity of a Well | USGS Water Supply Paper | 1963-01-01 | Theis, C.V., Brown, R.H., Myer, R.R. | |
Perennial Yield Update – Division and North Shore Hydrologic Subunits | 2010-03-24 | Thomas Harder & Co. | ||
Analysis of Potential Groundwater Resources in the Upper Arrastre Creek Drainage | 2010-06-30 | Thomas Harder & Co. | ||
Draft Shay Pond Area Hydrogeologic Assessment for the Unarmored Threespine Stickelback Fish | 2017-08-31 | Thomas Harder & Co. | ||
Sand Canyon Recharge Evaluation TM | 2017-11-29 | Thomas Harder & Co. | ||
Analysis of the Hydrologic Connection Between Groundwater Pumped by the City of Big Bear Lake Department of Water Division Wells and Surface Water in Big Bear Lake TM | 2020-03-16 | Thomas Harder & Co. | ||
Geotracker Database | 2022-01-01 | California State Water Resources Control Board (SWRCB) |