GSP Initial Notification
5-022.11 SAN JOAQUIN VALLEY
Mid-Kaweah GSA
10/10/2017
06/30/2022
-
Multiple GSPs that cover the entire basin
-
3
-
No
-
Ongoing. A Coordination MOU has been executed by the three GSAs in Nov 2017 to govern the preparation of the SGMA-mandated Coordination Agmt.
Document(s):
-
-
-
- Mid-Kaweah GSA (Exclusive)
-
-
Yes
-
Paul Hendrix
(Mid-Kaweah GSA)
144 S. L Street, Tulare, CA93274
559-686-2166
jph@tulareid.org -
See Notice of Intent to prepare GSP as attached.
- 017_Mid-Kaweah_GSA_GSP_NOI_2017-10-10.pdf (811.2kB) Uploaded on 01/02/2018 at 11:10AM