GSP Annual Report
5-022.08 KINGS
2022 (OCT. 2021 - SEP. 2022)
Single Annual Report
GSP Annual Report Information Comments
03/31/2023 10:46 AM
2022 (OCT. 2021 - SEP. 2022)
Single Annual Report
- 5-022.08 KINGS (Kings_CentralKings_Adopted)
- 5-022.08 KINGS (Kings_NorthForkKings_Adopted)
- 5-022.08 KINGS (Kings_SouthKings_Adopted)
- 5-022.08 KINGS (Kings_McMullinArea_Adopted)
- 5-022.08 KINGS (Kings_KingsRiverEast_Adopted)
- 5-022.08 KINGS (Kings_NorthKings_Adopted)
- 5-022.08 KINGS (Kings_James_Adopted)
Ronnie Samuelian (Provost & Pritchard Consulting Group)
A Groundwater Extraction
Total Groundwater Extractions (AF)
1,943,168
Water Use Sectors
161,904
0
1,744,599
0
59,990
0
36,665
JID Wells Pumped in McMullin GSA
B Groundwater Extraction Methods
Meters
193,837
Direct
0-5 %
Flow meters
Typical accuracy for propeller and magnetic meters
Electrical Records
0
Land Use
1,707,631
Estimate
10-20 %
Calculated pumping from crop water demands minus surface water deliveries
Based on accuracy of Crop evapotranspiration estimates
Groundwater Model
0
Other
41,700
Estimate
10-20 %
Rural domestic pumping estimated based on vegetated area and standard indoor use
Accuracy based on professional judgement
C Surface Water Supply
Total Surface Water Supply (AF)
630,782
Methods Used to Determine
Flumes and water meters
Water Source Types
64,720
0
0
529,240
0
4,756
0
32,066
Riparian diversions and other non-project water
D Total Water Use
Total Water Use (AF)
2,573,950
Methods Used to Determine
Sum of all water supplies
Water Source Types
1,943,168
593,960
4,756
0
32,066
Riparian water diversions
Water Use Sectors
236,964
0
2,240,322
0
59,990
0
36,665
JID Wells Pumped in McMullin GSA
E Change in Storage
Method used to calculate change in storage
See annual report for a detailed description.