GSP Annual Report
5-022.08 KINGS
2021 (OCT. 2020 - SEP. 2021)
Single Annual Report
GSP Annual Report Information Comments
03/31/2022 2:34 PM
2021 (OCT. 2020 - SEP. 2021)
Single Annual Report
- Initial GSP 2020 - 5-022.08 KINGS (Kings_CentralKings_Adopted)
- Initial GSP 2020 - 5-022.08 KINGS (Kings_NorthForkKings_Adopted)
- Initial GSP 2020 - 5-022.08 KINGS (Kings_SouthKings_Adopted)
- Initial GSP 2020 - 5-022.08 KINGS (Kings_McMullinArea_Adopted)
- Initial GSP 2020 - 5-022.08 KINGS (Kings_KingsRiverEast_Adopted)
- Initial GSP 2020 - 5-022.08 KINGS (Kings_NorthKings_Adopted)
- Initial GSP 2020 - 5-022.08 KINGS (Kings_James_Adopted)
Ronnie Samuelian (Provost & Pritchard Consulting Group)
A Groundwater Extraction
Total Groundwater Extractions (AF)
2,293,436
Water Use Sectors
168,571
0
2,082,555
0
21,601
0
42,310
-
B Groundwater Extraction Methods
Meters
187,169
Direct
0-5 %
Flow meters
Typical accuracy for propeller and magnetic meters
Electrical Records
0
Land Use
2,060,967
Estimate
10-20 %
Calculated pumping from crop water demands minus surface water deliveries
Based on accuracy of Crop evapotranspiration estimates
Groundwater Model
0
Other
45,300
Estimate
10-20 %
Rural domestic pumping estimated based on vegetated area and standard indoor use
Accuracy based on professional judgement
C Surface Water Supply
Total Surface Water Supply (AF)
334,665
Methods Used to Determine
Flumes and water meters
Water Source Types
49,592
0
0
245,722
0
9,252
0
30,099
Riparian diversions and other non-project water
D Total Water Use
Total Water Use (AF)
2,628,101
Methods Used to Determine
Sum of all water supplies
Water Source Types
2,293,436
295,314
9,252
0
30,099
Riparian water diversions
Water Use Sectors
246,358
0
2,317,832
0
21,601
0
42,310
JID Wells Pumped in McMullin GSA
E Change in Storage
Method used to calculate change in storage
See annual report for a detailed description.
F Monitoring Network Module
G PMA Module
PMA Implementation Updates Implementation Update Export (CSV) PMA Export (CSV)
PMA ID | PMA Name | Lead GSA | Status | # Updates during WY |
---|---|---|---|---|
5-022.08_PMA_126 | Land Subsidence Data Gap Analysis | McMullin Area GSA, Kings River East GSA, Central Kings GSA, North Fork Kings GSA, North Kings GSA, South Kings GSA, James GSA | Submitted | 0 |
5-022.08_PMA_127 | Surface Water-Groundwater Interconnection Data Gap Analysis | McMullin Area GSA, Kings River East GSA, Central Kings GSA, North Fork Kings GSA, North Kings GSA, South Kings GSA, James GSA | Submitted | 0 |
5-022.08_PMA_128 | Domestic Well Mitigation Program | McMullin Area GSA, Kings River East GSA, Central Kings GSA, North Fork Kings GSA, North Kings GSA, South Kings GSA, James GSA | Submitted | 0 |
5-022.08_PMA_58 | Basin 11 Improvement Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_59 | Basin 11 Expansion Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_60 | Laton North Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_61 | North Fork Regional Recharge Project (NFRRP) | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_62 | Zonneveld Pond Improvement Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_63 | On-Farm Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_64 | Cerini Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_65 | Kamm Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_66 | Terra Linda Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_67 | Miscellaneous Landowner Recharge Basins | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_68 | Upgradient Recharge Outside the NFKGSA | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_69 | Mussel Slough Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_70 | Miscellaneous Dry Well Recharge Systems | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_71 | Miscellaneous Reverse Subsurface Tile Systems | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_72 | Laton North Phase 2 Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_73 | Pires Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_74 | North Fork Group Site 16 Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_75 | North Fork Group Site 3 Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_76 | North Fork Group Site 6 Recharge Project | North Fork Kings GSA | Submitted | 0 |
5-022.08_PMA_2 | DR01 - Del Rey CSD - American and Del Rey Ave. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_3 | DR02 - Del Rey CSD - Melruna and Carmel Ave. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_4 | DR03 - Del Rey CSD - South Del Rey Ave. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_5 | F01 - City of Fowler - 19.5 Acre basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_6 | K01 - City of Kingsburg - Madson Ave. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_7 | K02 - City of Kingsburg - Athwal Park basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_8 | K03 - City of Kingsburg - 22.5 Acre basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_9 | P01 - City of Parlier - Industrial Drive basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_10 | P02 - City of Parlier - Milton Ave. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_11 | P03 - City of Parlier - Tuolumne St. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_12 | P04 - City of Parlier - Manning Ave. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_13 | P05 - City of Parlier - Avila St. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_14 | P06 - City of Parlier - Mendocino Ave basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_15 | P07 - City of Parlier - Academy Ave. basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_16 | P08 - City of Parlier - 4.2 Acre basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_17 | S01 - City of Sanger - Kelly basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_18 | S02 - City of Sanger - Medrano basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_19 | S03 - City of Sanger - West Sanger 7.6 Acre basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_20 | S04 - City of Sanger - North Sanger 27.4 Acre basin | South Kings GSA | Submitted | 0 |
5-022.08_PMA_21 | EO1 - Regular Communication | South Kings GSA | Submitted | 0 |
5-022.08_PMA_22 | EO2 - Minimum threshold exceedances | South Kings GSA | Submitted | 0 |
5-022.08_PMA_23 | WH1 - Registration of extraction facilities | South Kings GSA | Submitted | 0 |
5-022.08_PMA_24 | WH2 - Installation of sounding tubes and water quality sample ports | South Kings GSA | Submitted | 0 |
5-022.08_PMA_25 | WH3 - Self-Reporting of groundwater extraction, level, and water quality | South Kings GSA | Submitted | 0 |
5-022.08_PMA_26 | WH4 - Prohibition of composite wells | South Kings GSA | Submitted | 0 |
5-022.08_PMA_27 | GP1 - Regulate groundwater exports | South Kings GSA | Submitted | 0 |
5-022.08_PMA_28 | GP2 - Require new developments to prove sustainable water supply | South Kings GSA | Submitted | 0 |
5-022.08_PMA_29 | GP3 - Pumping restrictions during droughts | South Kings GSA | Submitted | 0 |
5-022.08_PMA_114 | Fresno City Wastewater Treatment Plant Recharge Basins, FID Houghton Canal System | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_115 | Fresno City Wastewater Treatment Plan Recharge Basin, FID Lower Dry Creek System | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_116 | Southwest Groundwater Banking | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_117 | Lassen Avenue Reverse Flow and Recharge | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_118 | MAGSA Groundwater Banking Program | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_119 | McMullin On-Farm Flood Capture Expansion | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_120 | Houghton Wastewater Expansion | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_121 | South Sandridge Canal Water Supply & Recharge | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_122 | Stinson North Canal Water Supply and Recharge | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_123 | Grantland Area Recharge | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_124 | Consolidated ID Wristen Ditch Intertie | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_125 | Upgradient Recharge Programs | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_129 | EO1 - Regular Communication | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_130 | EO2 - Minimum threshold exceedances | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_131 | WH1 - Registration of extraction facilities | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_132 | WH2 - Installation of sounding tubes and water quality sample ports | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_133 | WH3 - Self-Reporting of groundwater extraction, level, and water quality | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_134 | WH4 - Prohibition of composite wells | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_135 | GA-2 Development of Groundwater Allocation Per Acre | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_136 | GA-3 Groundwater Allocation "Ramp-Down" Gradual Decrease | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_137 | GA-4 Groundwater Allocation "Adaptive Management" Approach | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_138 | GA-1 Groundwater Quantification Methods | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_139 | GP1 - Regulate groundwater exports | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_140 | GP2 - Require new developments to prove sustainable water supply | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_141 | GP3 - Pumping restrictions during droughts | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_142 | GMT-1 Groundwater Allocation Carryover Structure | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_143 | GMT-2 Water Marketing Strategy Study | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_144 | GMT-3 Groundwater Banking Program | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_145 | GMT-4 Groundwater Trading Structure | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_146 | GMT-5 Regulate Groundwater Allocation Transfers Outside of GSA | McMullin Area GSA | Submitted | 0 |
5-022.08_PMA_77 | North Tulare County Surface Water Treatment Plant | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_78 | Water Supply Augmentation | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_79 | North London Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_80 | South London Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_81 | North Caesar Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_82 | North Traver Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_83 | South Traver Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_84 | Monson-Sultana Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_85 | South Caesar Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_86 | Highway 63 Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_87 | West 99 Water Supply Augmentation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_88 | Avenue 352 Water Supply Augementation Area | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_89 | Enhanced Utilization of High Flows from the Kings River | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_90 | OCID Customized Rules and Regulations for Reducing Groundwater Reliance | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_91 | Sultana Stormwater/Recharge Basin | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_92 | Education and Communication | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_93 | Well Facility Registration | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_94 | Groundwater Quantification | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_95 | Sustainable Water Supply for New Developments | Kings River East GSA | Submitted | 0 |
5-022.08_PMA_30 | Water Meter Project | North Kings GSA | Submitted | 0 |
5-022.08_PMA_31 | Biola Groundwater Recharge Project | North Kings GSA | Submitted | 0 |
5-022.08_PMA_32 | Marion Recharge Basin Improvements | North Kings GSA | Submitted | 0 |
5-022.08_PMA_33 | ST-WRF Expansion | North Kings GSA | Submitted | 0 |
5-022.08_PMA_34 | Clovis SWTP Expansion | North Kings GSA | Submitted | 0 |
5-022.08_PMA_35 | Clovis SWTP Pretreatment | North Kings GSA | Submitted | 0 |
5-022.08_PMA_36 | Southeast Reclamation Facility and Distribution System | North Kings GSA | Submitted | 0 |
5-022.08_PMA_37 | Northeast Surface Water Treatment Facility Expansion | North Kings GSA | Submitted | 0 |
5-022.08_PMA_38 | Southwest Reclamation Facility and Distribution System | North Kings GSA | Submitted | 0 |
5-022.08_PMA_39 | Lions Park Groundwater Recharge Project | North Kings GSA | Submitted | 0 |
5-022.08_PMA_40 | Savory Pond Expansion | North Kings GSA | Submitted | 0 |
5-022.08_PMA_41 | On-Farm Recharge Program | North Kings GSA | Submitted | 0 |
5-022.08_PMA_42 | Ricchiuti Recharge Basin Project | North Kings GSA | Submitted | 0 |
5-022.08_PMA_43 | Basin CF - Stormwater Recharge and Flood Projection Project | North Kings GSA | Submitted | 0 |
5-022.08_PMA_44 | PCWD Residential Meter Installation | North Kings GSA | Submitted | 0 |
5-022.08_PMA_45 | County of Fresno NKGSA Recharge Program | North Kings GSA | Submitted | 0 |
5-022.08_PMA_46 | EO-1 Regular Communication | North Kings GSA | Submitted | 0 |
5-022.08_PMA_47 | EO-2 Non-Routine Responses to Minimum Threshold Exceedances | North Kings GSA | Submitted | 0 |
5-022.08_PMA_48 | WH-1 Registration of Extraction Facilities | North Kings GSA | Submitted | 0 |
5-022.08_PMA_49 | WH-2 Installation of Wellhead Meters, Sounding Tubes and Water Quality Sample Ports | North Kings GSA | Submitted | 0 |
5-022.08_PMA_50 | WH-3 Self-Reporting of Groundwater Extraction, Level, and Water Quality | North Kings GSA | Submitted | 0 |
5-022.08_PMA_51 | GA-1 Groundwater Quantification Methods | North Kings GSA | Submitted | 0 |
5-022.08_PMA_52 | GA-2 Development of Groundwater Allocation Per Acre | North Kings GSA | Submitted | 0 |
5-022.08_PMA_53 | GA-3 Groundwater Allocation "Ramp-Down" Gradual Decrease | North Kings GSA | Submitted | 0 |
5-022.08_PMA_54 | GA-4 Groundwater Allocation "Adaptive Management" Approach | North Kings GSA | Submitted | 0 |
5-022.08_PMA_55 | GP-1 Regulate Groundwater Exports | North Kings GSA | Submitted | 0 |
5-022.08_PMA_56 | GP-2 Require New Developments to Prove Sustainability Water Supply | North Kings GSA | Submitted | 0 |
5-022.08_PMA_57 | GP-3 Pumping Restrictions During Droughts | North Kings GSA | Submitted | 0 |
5-022.08_PMA_1 | TEST PROJECT - DELETE | James GSA | Submitted | 0 |
5-022.08_PMA_107 | Lassen Avenue Floodwater Utilization | James GSA | Submitted | 0 |
5-022.08_PMA_108 | McMullin Grade Floodwater Utilization | James GSA | Submitted | 0 |
5-022.08_PMA_109 | Distributed Recharge Basins | James GSA | Submitted | 0 |
5-022.08_PMA_110 | James Ranch Recharge Basin | James GSA | Submitted | 0 |
5-022.08_PMA_111 | Wildlife Habitat Restoration | James GSA | Submitted | 0 |
5-022.08_PMA_112 | Mendota Pool Water Quality Monitoring | James GSA | Submitted | 0 |
5-022.08_PMA_113 | Lake Avenue Canal | James GSA | Submitted | 0 |
5-022.08_PMA_96 | Central Valley Project Water Banking | James GSA | Submitted | 0 |
5-022.08_PMA_97 | Mendota Pool Water Quality Engagement | James GSA | Submitted | 0 |
5-022.08_PMA_98 | Basins 1 and 2 Storage and Recharge | James GSA | Submitted | 0 |
5-022.08_PMA_99 | Basin 3 Floodwater Capture and Recharge | James GSA | Submitted | 0 |
5-022.08_PMA_100 | Floodway Recharge and Spreading | James GSA | Submitted | 0 |
5-022.08_PMA_101 | City of San Joaquin Storm Water Pond Recharge | James GSA | Submitted | 0 |
5-022.08_PMA_102 | Carmichael Slough Recharge | James GSA | Submitted | 0 |
5-022.08_PMA_103 | James Main Canal Spreading | James GSA | Submitted | 0 |
5-022.08_PMA_104 | Fresno Slough Recharge | James GSA | Submitted | 0 |
5-022.08_PMA_105 | Mud Dam Spreading and Recharge | James GSA | Submitted | 0 |
5-022.08_PMA_106 | James Bypass Floodwater Utilization | James GSA | Submitted | 0 |