Go Back Print Comments

Coachella Valley Water District - Mission Creek, Desert Water Agency - Mission Creek, Mission Springs Water District

(7-021.02 COACHELLA VALLEY MISSION CREEK) Existing Plan

ASubmitting Agency and Contact Information

  1. Zoe Rodriguez del Rey
  2. MULTIPLE

    Coachella Valley Water District - Mission Creek, Desert Water Agency - Mission Creek, Mission Springs Water District
  3. The three submitting agencies agreed to jointly submit an alternative as memorialized in the attached letter. A memorandum of understanding is being finalized. Resolutions or board actions items were also adopted as attached.

    20161229 FINAL signed Mission Creek GSP Submittal Letter.pdf (85.6kB) Uploaded on 12/29/2016 at 03:48PM 20160726 CVWD BAI.pdf (373.4kB) Uploaded on 12/29/2016 at 03:48PM Res 1147 - DWA SGMA Alternatives.pdf (500.3kB) Uploaded on 12/29/2016 at 03:48PM CVWD Resolution of Plan Adoption MCGH WMP 2013-76.pdf (364.8kB) Uploaded on 12/29/2016 at 03:49PM DWA 01073 Adopt the Mission CreekGarnet Hill Water Mgmnt Plan.pdf (196.5kB) Uploaded on 12/29/2016 at 03:49PM MSWD Resolution 2014-01 Adoption MCGH WMP.PDF (5.4MB) Uploaded on 12/29/2016 at 03:49PM
  4. Yes - Existing GSA

    Coachella Valley Water District, Desert Water Agency, Mission Springs Water District

BAlternative Information

  1. 7-021.02 COACHELLA VALLEY MISSION CREEK
  2. A plan developed pursuant to Part 2.75 (commencing with Section §10750) or other law authorizing groundwater management.

    The Bridge Document for the Mission Creek Subbasin describes plan compliance with SGMA requirements. Cited appendices and references documents not readily available on the internet are also attached.

    20161229 SGMA Bridge Document - Mission Creek - Final.pdf (22.8MB) Uploaded on 12/29/2016 at 03:53PM App A-1 Mission Creek Garnet Hill Report_20130128.pdf (22.4MB) Uploaded on 12/29/2016 at 03:55PM App A-1 MissionCr_GarnetHill_Model_Report App B of MCGH WMP.pdf (1.3MB) Uploaded on 12/29/2016 at 03:55PM App A-1 MissionCr_GarnetHill_Model_Report Figures_Reduced App B of MCGH WMP.pdf (8.9MB) Uploaded on 12/29/2016 at 03:56PM App A-2 2010 MissionCr_GarnetHill_Conc_Model_Figures.pdf (19.4MB) Uploaded on 12/29/2016 at 03:56PM App A-2 2010 MissionCr_GarnetHillConceptualModel.pdf (616.6kB) Uploaded on 12/29/2016 at 03:57PM App A-3 CVWD RAC Engineers Report 2016-2017_Final.pdf (7.6MB) Uploaded on 12/29/2016 at 03:57PM App A-4 2016-2017 DWA GW Repl & Assmt Engr Rpt (May 2016).pdf (29.1MB) Uploaded on 12/29/2016 at 03:58PM App B Mission Creek Water Management Agreement (dated 7-15-14).pdf (984.1kB) Uploaded on 12/29/2016 at 03:59PM App C Mission Creek Settlement_Agreement_12.7.04.pdf (711kB) Uploaded on 12/29/2016 at 03:59PM App D 039_Coachella_Valley_Water_District_GSA_2015-11-06.pdf (6.4MB) Uploaded on 12/29/2016 at 03:59PM App D 042_Desert_Water_Agency_GSA_2015-11-20.pdf (2MB) Uploaded on 12/29/2016 at 03:59PM App D 064-1_Mission_Springs_Water_District_GSA_2016-02-03_revised.pdf (19.5MB) Uploaded on 12/29/2016 at 04:01PM Geotechnical Consultants - Hydrogeologic Investigation MC Subbasin Within the Desert Hot Springs CWD for DWA.pdf (7.2MB) Uploaded on 12/29/2016 at 04:01PM
  3. The Alternative Groundwater Sustainability Plan - Bridge Document for the Mission Creek Subbasin describes how the Alternative covers the entire basin.

  4. Coachella Valley Water District, Mission Springs Water District

  5. Mission Creek EIF.pdf (21.8kB) Uploaded on 12/29/2016 at 03:55PM

CAlternative Elements

  1. The elements of the Alternative required by Articles 5 and 7 of the GSP regulations are described in tabular form in the Alternative Groundwater Sustainability Plan - Bridge Document for the Mission Creek Subbasin.

    20161229 SGMA Bridge Document - Mission Creek - Final.pdf (22.8MB) Uploaded on 12/29/2016 at 04:53PM