Coachella Valley Water District - Indio, Desert Water Agency - Indio, Coachella Water Authority, Indio Water Authority
(7-021.01 COACHELLA VALLEY INDIO) Existing Plan
ASubmitting Agency and Contact Information
-
Zoe Rodriguez del Rey (CVWD)
75515 Hovely Lane East
(760) 398-2661 ext. 2389
zrodriguezdelrey@cvwd.org -
MULTIPLE
Coachella Valley Water District - Indio, Desert Water Agency - Indio, Coachella Water Authority, Indio Water Authority -
The four submitting agencies developed a memorandum of understanding regarding preparation and submittal of this alternative plan. Resolutions or board action items were also adopted as attached.
FINAL Indio Subbasin SGMA MOU.pdf (289.6kB) Uploaded on 12/29/2016 at 09:25AM Res 1147 - DWA SGMA Alternatives.pdf (500.3kB) Uploaded on 12/29/2016 at 02:17PM 20160726 CVWD BAI.pdf (373.4kB) Uploaded on 12/29/2016 at 02:22PM -
Yes - Existing GSA
Coachella Valley Water District, Coachella Water Authority, Desert Water Agency, Indio Water Authority
BAlternative Information
-
7-021.01 COACHELLA VALLEY INDIO
-
A plan developed pursuant to Part 2.75 (commencing with Section §10750) or other law authorizing groundwater management.
The Bridge Document for the Indio Subbasin describes plan compliance with SGMA requirements. Cited appendices and reference documents not readily available on the internet are also attached.
20161228 SGMA Bridge Document - Indio - Final.pdf (14.8MB) Uploaded on 12/29/2016 at 02:24PM App A-1 2002 Coachella Valley WMP - Final.pdf (6.1MB) Uploaded on 12/29/2016 at 02:24PM App A-2 2002 Coachella Valley WMP Draft PEIR.pdf (28.7MB) Uploaded on 12/29/2016 at 02:27PM App A-2 2002 Coachella Valley WMP Final PEIR.pdf (30.6MB) Uploaded on 12/29/2016 at 02:27PM App A-3 2010 Coachella Valley WMP Update Final Report.pdf (6MB) Uploaded on 12/29/2016 at 02:28PM App A-4 20110701 WMP Update Draft SPEIR.pdf (20MB) Uploaded on 12/29/2016 at 02:28PM App A-4 20120125 WMP Update Final SPEIR.pdf (9.3MB) Uploaded on 12/29/2016 at 02:29PM App A-5 2014 Status Report on 2010 CVWMP Update-Final.pdf (1MB) Uploaded on 12/29/2016 at 02:29PM App A-6 CVWD RAC Engineers Report 2016-2017_Final.pdf (7.6MB) Uploaded on 12/29/2016 at 02:31PM App A-7 2016-2017 DWA GW Repl & Assmt Engr Rpt (May 2016).pdf (29.1MB) Uploaded on 12/29/2016 at 02:31PM App B 021_Imperial_County_GSA_2015-09-04_v2.pdf (3.4MB) Uploaded on 12/29/2016 at 02:31PM App B 039_Coachella_Valley_Water_District_GSA_2015-11-06.pdf (6.4MB) Uploaded on 12/29/2016 at 02:31PM App B 042_Desert_Water_Agency_GSA_2015-11-20.pdf (2MB) Uploaded on 12/29/2016 at 02:33PM App B 064-1_Mission_Springs_Water_District_GSA_2016-02-03_revised.pdf (19.5MB) Uploaded on 12/29/2016 at 02:33PM App B 071_Indio_Water_Authority_GSA_2016-03-14.pdf (3MB) Uploaded on 12/29/2016 at 02:33PM App B 073_Coachella_Water_Authority_GSA_2016-03-23.pdf (5.8MB) Uploaded on 12/29/2016 at 02:33PM App C-1 CVWD Coachella MOU to support WMP Programs.pdf (290.9kB) Uploaded on 12/29/2016 at 02:33PM App C-2 CVWD-Indio Settlement Agreement.pdf (961.1kB) Uploaded on 12/29/2016 at 02:33PM USGS Swain WRI 77-29.pdf (7.4MB) Uploaded on 12/29/2016 at 02:40PM Indio Subbasin Alternative Plan Transmittal letter.pdf (116.9kB) Uploaded on 12/29/2016 at 02:46PM -
The Alternative Groundwater Sustainability Plan - Bridge Document for the Indio Subbasin describes how the Alternative covers the entire basin.
-
Coachella Valley Water District, City of Coachella Water Authority, Desert Water Agency, City of Indio Water Authority, Mission Springs Water District
-
EIF form for Alternative Plan.pdf (257.6kB) Uploaded on 12/29/2016 at 09:30AM
CAlternative Elements
-
The elements of the Alternative required by Articles 5 and 7 of the GSP regulations are described in tabular form in the Alternative Groundwater Sustainability Plan - Bridge Document for the Indio Subbasin.
20161228 SGMA Bridge Document - Indio - Final.pdf (14.8MB) Uploaded on 12/29/2016 at 04:51PM