Seaside Basin Annual Report 10/01/2022 - 09/30/2023
Watermaster Information
Seaside Basin |
3-04.08 SALINAS VALLEY - SEASIDE AREA |
||
California American Water vs. numerous Defendants and Intervenors | M66343 | 02/09/2007 | |
Seaside Basin | P.O. Box Box 51502 | Pacific Grove | 93950 |
watermasterseaside@sbcglobal.net | (831) 641-0113 | None | |
Bob Jaques | 83 Via Encanto | Monterey | 93940 |
bobj83@comcast.net | (831) 375-0517 | ||
Amended Court Decision 2-9-07 3-26-13.doc (572kB) | |||
AdjudicatedSSboundary.zip (15.7kB) | |||
http://www.seasidebasinwatermaster.org |
[pagebreak]
A
Groundwater Level
Is water level data submitted to the CASGEM Program?
Yes
Does this watermaster collect or receive additional groundwater levels?
Yes
Does this watermaster measure groundwater levels?
Yes
Comment(s)
Monterey Peninsula Water Management District (MPWMD) is the CASGEM Monitoring Entity for the Seaside Basin. MPWMD submits water level data for the additional wells that are monitored by them for the Seaside Basin Watemaster.
[pagebreak]
B
Groundwater Use
Reporting Period
From 10/01/2022 To 09/30/2023
Total Annual Groundwater Extraction (AF)
Method used to determine extraction (if available):
Volume (AF) | Explanation | Uncertainty | |
---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Groundwater Extraction by water use sector (if available):
Sector | Volume (AF) | Explanation | Uncertainty |
---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[pagebreak]
C
Surface Water Use
Reporting Period
From 10/01/2022 To 09/30/2023
Surface Water Supply (AF)
Method used to determine
Metered
Uncertainty
Low
Water available for recharge or in-lieu use by source type (if available):
Volume (AF) | Explanation | Uncertainty | |
---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[pagebreak]
D
Total Water Use
These data are not available
Explanation
It is not possible to accurately determine total water use in the Basin because ground and surface waters from multiple sources (Seaside Basin and Carmel River Basin as well as Sand City's desalination plant) are comingled within the Cal Am distribution system which serves the Seaside Basin as well as the rest of Cal Am's customers. In addition MCWD provides service to some users within the Basin boundaries. These water purveyors do not have any direct means of extracting that consumption data from their account records.
[pagebreak]
E
Change in GW Storage
Reporting Period
From 10/01/2022 To 09/30/2023
Change in storage (AF)
Method used to determine
Groundwater model and groundwater contour interpretations
Uncertainty
Medium
[pagebreak]
F
Required Documents
Reporting Period
From 10/01/2022 To 09/30/2023
Please submit an electronic (PDF preferred) copy of your annual report.
2023 Final Annual Report 1-4-24.pdf (15.1MB)
Uploaded on 03/11/2024 at 02:09PM
Please submit additional reports or documents.