Brite Basin Annual Report 01/01/2018 - 12/31/2018
Watermaster Information
| Brite Basin |
5-80 BRITE VALLEY |
||
| TCCWD vs. Austin et al | 97211 | 12/09/1970 | |
| Tehachapi-Cummings County Water District | PO Box 326 | Tehachapi | 93581 |
| tccwd@tccwd.com | 6618225504 | 6618225122 | |
| Tom Neisler | PO Box 326 | Tehachapi | 93581 |
| tneisler@tccwd.com | 6618225504 | ||
| Brite Basin Judgement (97211).pdf (671.7kB) | |||
| tccwd_adjudicated_basins.zip (567.5kB) | |||
| http://www.tccwd.com | |||
[pagebreak]
A
Groundwater Level
Is water level data submitted to the CASGEM Program?
Yes
Does this watermaster collect or receive additional groundwater levels?
Yes
Does this watermaster measure groundwater levels?
Yes
Comment(s)
Owners have not granted permission to disclose voluntary well soundings.
[pagebreak]
B
Groundwater Use
Reporting Period
From 01/01/2018 To 12/31/2018
Total Annual Groundwater Extraction (AF)
Method used to determine extraction (if available):
| Volume (AF) | Explanation | Uncertainty | |
|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Groundwater Extraction by water use sector (if available):
| Sector | Volume (AF) | Explanation | Uncertainty |
|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[pagebreak]
C
Surface Water Use
Reporting Period
From 01/01/2018 To 12/31/2018
Surface Water Supply (AF)
Method used to determine
Meter
Uncertainty
Low
Water available for recharge or in-lieu use by source type (if available):
| Volume (AF) | Explanation | Uncertainty | |
|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[pagebreak]
D
Total Water Use
Reporting Period
From 01/01/2018 To 12/31/2018
Total Water Use (AF)
Method used to determine
Meter, land use
Uncertainty
Medium
Total water Use by water use sector (if available)
| Volume (AF) | |
|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Water use met by source type
| Type | Volume (AF) |
|---|---|
|
|
|
|
|
|
|
|
|
|
|
[pagebreak]
E
Change in GW Storage
Reporting Period
From 01/01/2018 To 12/31/2018
Change in storage (AF)
Method used to determine
well soundings
Uncertainty
Medium
[pagebreak]
F
Required Documents
Reporting Period
From 01/01/2018 To 12/31/2018
Please submit an electronic (PDF preferred) copy of your annual report.
Brite Basin Judgement (97211).pdf (671.7kB)
Uploaded on 04/06/2019 at 09:44AM
Please submit additional reports or documents.
Well Measurement Reporting Sheet Rev 12 190205.xlsx (3.8MB)
Uploaded on 04/06/2019 at 09:44AM
