Cucamonga Basin Annual Report 10/01/2014 - 09/30/2015
Watermaster Information
Cucamonga Basin |
8-02.02 UPPER SANTA ANA VALLEY - CUCAMONGA |
||
San Antonio Water Company v. Foothill Irrigation Company, et al., San Bernardino Superior Court | 92645 | 04/25/1958 | |
Cucamonga Valley Water District, San Antonio Water Company and West End Consolidated Water Company | c/o John Bosler, Cucamonga Valley Water District, 10440 Ashford Street | Rancho Cucamonga | 97130 |
johnbo@cvwdwater.com | (909) 987-2591 | ||
Lynn Groundwater | 455 W. Fir Avenue | Clovis | 93611 |
lgroundwater@ppeng.com | 559-449-2700 | ||
1958 Decree.pdf (1.6MB) | |||
CucBasin_AdjBdry_WEI2017.zip (33.2kB) | |||
[pagebreak]
A
Groundwater Level
Is water level data submitted to the CASGEM Program?
Yes
Does this watermaster collect or receive additional groundwater levels?
Yes
Comment(s)
[pagebreak]
B
Groundwater Use
Reporting Period
From 10/01/2014 To 09/30/2015
Total Annual Groundwater Extraction (AF)
Method used to determine extraction (if available):
Volume (AF) | Explanation | Uncertainty | |
---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Groundwater Extraction by water use sector (if available):
Sector | Volume (AF) | Explanation | Uncertainty |
---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[pagebreak]
C
Surface Water Use
Reporting Period
From 10/01/2014 To 09/30/2015
Surface Water Supply (AF)
Method used to determine
Uncertainty
Water available for recharge or in-lieu use by source type (if available):
Volume (AF) | Explanation | Uncertainty | |
---|---|---|---|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
[pagebreak]
D
Total Water Use
These data are not available
Explanation
The three water producer parties in the Cucamonga Basin (Cucamonga Valley Water District, San Antonio Water Company and West End Consolidated Water Company) have service areas that extend beyond the boundaries of the Basin, and the specific proportion of their total water use within the Cucamonga Basin is not reported. Total water use data (within and outside the Basin) is collected and maintained by each of the three pumpers in the Cucamonga Basin.
[pagebreak]
E
Change in GW Storage
Reporting Period
From 10/01/2014 To 09/30/2015
Change in storage (AF)
Method used to determine
Uncertainty
[pagebreak]
F
Required Documents
Reporting Period
From 10/01/2014 To 09/30/2015
Please submit an electronic (PDF preferred) copy of your annual report.
Note on Annual Reporting for Cuc Basin.pdf (64.8kB)
Uploaded on 04/01/2016 at 07:15AM
Please submit additional reports or documents.